Empowering the Philippines with Sustainable Energy
300 MWac
Peak solar export capacity (389.996 MWp solar array)
60 MW
Integrated BESS rating (301 MWh storage delivery)
₱50M
SEC-registered authorized capital (Incorporated June 2024)
Sarangani Solar Facility Overview
Disciplined site selection and technical modeling anchor the proposed utility development in Barangay Amsipit, Maasim.
Barangay Amsipit Allocation
Pre-Development Status
Grid Interconnection Scope
Comprehensive topographic survey covering 311.85 hectares optimized for maximum photovoltaic exposure and structural stability.
DOE authorization covers ongoing site feasibility modeling, environmental baseline testing, and preliminary engineering evaluations.
Proposed 11.5 km, 69 kV transmission connection subject to NGCP system impact studies and final regulatory confirmation.


Disciplined Governance and Faith Principles
Our operational framework integrates faith-guided corporate stewardship with rigorous SEC compliance to deliver reliable energy infrastructure. We prioritize transparent partnership with host communities and municipal stakeholders across Mindanao.
Incorporated with SEC Registration No. 2024060156131-02, CDBEC executes feasibility-vetted infrastructure engineering alongside technical co-developer Full Advantage Phils. International Inc.
Access vetted financial modeling, site disclosures, and EPC investment parameters for the 300 MWac Sarangani project.